Scope of Work Systemic Renovation: HVAC & Building Envelope / Replace the 1969-1974 central controls system, HVAC piping, all ten (10) AHUs, 45 finned tube radiators, four (4) self-contained unit
Scope of Work Systemic Renovation: HVAC & Building Envelope / Replace the 1969-1974 central controls system, HVAC piping, all ten (10) AHUs, 45 finned tube radiators, four (4) self-contained unit
Course: Carpentry 1 Carpentry 1 Career Academies and Programs of Study: Architecture and Design The course of study for Carpentry I (Level I) includes demonstration of student mastery of the
Electric and Electronic Shop Examples of Work Includes Installing upgraded electrical service equipment Installs, repairs, and maintains: light fixtures clock systems PA systems electrical outlets
Bowie-Belair High Annex grey-background grey-background Project Overview The major renovation of the Bowie-Belair High School Annex has been completed, addressing five major systemic projects along
Phyllis E. Williams Spanish Immersion grey-background grey-background grey-background Project Overview The major renovation of Phyllis E. Williams Spanish Immersion (PEWSI) consists of replacing the
Position: Carpentry Master Foreman Facilities Supervisor - Maintenance 35 ASASP Unit III Building Services - Carpenter Shop 26 Under the direction of the Facilities Supervisor, the Carpentry Master
View listings of our common supportive websites available throughout PGCPS.
Position: Asbestos Abatement Worker II Environmental Program Specialist 31 Local 2250 ACE/AFSCME Environmental Office Table 200, Grade 18 The Asbestos Abatement Worker II performs maintenance and
Interpreting Fluency PGCPS Fluency Online Interpreter Scheduling System Fluency Requester Training Module Simultaneous Interpreting in Zoom PGCPS Interpreting: Using Simultaneous Interpretation in